Bioelectric power plant BGU100
Price from: $ 387467
The energy complex provides processing of manure of 500 pigs in a volume of 5 tons / day (humidity 80%). Biogas plant BGU-100 provides disinfection of cattle manure. Designed for autonomous provision of farms, state enterprises, small urban settlements. Those. specifications The energy complex provides processing in the amount of 5 tons / day (humidity 80%). Biogas plant BGU-100 provides disinfection of cattle manure, production of biogas in the amount of 8m3 / hour. Electricity generation from biogas – 10 kW Or heat energy generation from biogas – 20 kW. EK 100 station Electricity generation is 16 kW, while auxiliary needs will be about 3 kW. Heat generation will be about 0.1 Gcal. The amount of ash, which can be used as fertilizer, at the output will be about 250 / day.
Send Me Quotation
The function is avialable for logged in users only
Specification
Product value | 750 м3 |
Product length | 15 м |
Product width | 10 м |
Product height | 5 м |
Product SKU | БГУ100 |
Reviews
There are no reviews yet.